Sichuan hydroelectric station, with a section of 2.7×2.4 meters, uses a tunneling drill rig equipped with the WOSERLD hydraulic rock drill. The hole depth is 3.4 meters, with an average drilling time of 1 minute and 30 seconds per hole.
Sichuan hydroelectric station, with a section of 2.7×2.4 meters, uses a tunneling drill rig equipped with the WOSERLD hydraulic rock drill. The hole depth is 3.4 meters, with an average drilling time of 1 minute and 30 seconds per hole.