Guangxi Pumped Storage Power Station: Cross-section of 9×8 meters, using a jumbo drill rig equipped with a WOSERLD hydraulic rock drill for grouting holes. Hole depth is 7.4 meters, with an average drilling time of 9 minutes per hole.
Guangxi Pumped Storage Power Station: Cross-section of 9×8 meters, using a jumbo drill rig equipped with a WOSERLD hydraulic rock drill for grouting holes. Hole depth is 7.4 meters, with an average drilling time of 9 minutes per hole.