Jiangsu underground engineering, with a working face of 9×11 meters, utilizes a multi-arm bolting rig equipped with the WOSERLD hydraulic rock drill. The hole depth is 4.5 meters, with an average drilling time of 3 minutes per hole.
Jiangsu underground engineering, with a working face of 9×11 meters, utilizes a multi-arm bolting rig equipped with the WOSERLD hydraulic rock drill. The hole depth is 4.5 meters, with an average drilling time of 3 minutes per hole.