Project Case

project case

Inner Mongolia Lead-Zinc uses a bolting rig equipped with the WOSERLD M10B/D hydraulic rock drill

Release Time: 2023-12-16

Inner Mongolia Lead-Zinc Mine, with a cross-section of 3.5×4.2 meters, uses a bolting rig equipped with the WOSERLD M10B/D hydraulic rock drill. The anchor rod length is 2 meters, and the average time per hole is 1 minute.

× How can I help you?