Pumped Storage Power Station uses a rock drilling rig equipped with a WOSERLD hydraulic rock drill for drilling anchor rod holes
Release Time: 2023-12-01
Pumped Storage Power Station uses a rock drilling rig equipped with a WOSERLD hydraulic rock drill for drilling anchor rod holes. The hole depth is 4.6 meters, and the average time per hole is 3 minutes.