Project Case

project case

Shandong Gold Mine, uses a bolting rig equipped with the independently developed WOSERLD W14B/D hydraulic rock drill

Release Time: 2023-11-09

Shandong Gold Mine, with a cross-section of 4.3×4.3 meters, uses a bolting rig equipped with the independently developed WOSERLD W14B/D hydraulic rock drill. The drill rod length is 2.475 meters, and the average time per hole is 45 seconds.

× How can I help you?