Project Case

project case

Inner Mongolia Fluorite Mine, Tunneling jumbo equipped with Woserld 18KW hydraulic rock drill

Release Time: 2025-10-30

Inner Mongolia Fluorite Mine, Cross-section: 3x3m. Tunneling jumbo equipped with Woserld 18KW hydraulic rock drill. Hole depth: 3.4m, average time per hole: 1 minute 30 seconds.