Project Case

project case

Iron Mine, Tunneling jumbo equipped with a Woserld hydraulic rock drill.

Release Time: 2025-10-30

Iron Mine, Cross-section: 4x4m. Tunneling jumbo equipped with a Woserld hydraulic rock drill. Rock hardness: F8-F10, hole depth: 3.8m, average time per hole: 1 minute 20 seconds.