Project Case

project case

ock hardness F12. bolting rig  equipped with Woserld hydraulic rock drill, hole depth 4 m

Release Time: 2025-03-29

Underground engineering project, cross-section 8×7.5 m, rock hardness F12. bolting rig  equipped with Woserld hydraulic rock drill, hole depth 4 m, average drilling time per hole: 2 minutes 30 seconds.

× How can I help you?