Project Case

project case

Iron Mine, using a roof bolter equipped with a WOSERLD hydraulic rock drill.

Release Time: 2025-02-27

Liaoning Iron Mine: Cross-section of 4×3.8 meters, rock hardness F10, using a roof bolter equipped with a WOSERLD hydraulic rock drill. Bolt hole depth is 2 meters, with an average drilling time of 1 minute and 30 seconds per hole.

× How can I help you?