Project Case

project case

Transport tunnel , equipped with a Woserld hydraulic rock drill

Release Time: 2024-08-14

Transport tunnel with a cross-section of 8.5*14 meters, equipped with a Woserld hydraulic rock drill. The hole depth is 3.8 meters, and it takes 5-6 hours to drill 150-170 holes.

× How can I help you?