Transport tunnel with a cross-section of 8.5*14 meters, equipped with a Woserld hydraulic rock drill. The hole depth is 3.8 meters, and it takes 5-6 hours to drill 150-170 holes.
Transport tunnel with a cross-section of 8.5*14 meters, equipped with a Woserld hydraulic rock drill. The hole depth is 3.8 meters, and it takes 5-6 hours to drill 150-170 holes.