Project Case

project case

Phosphate Mine, equipped with Woserld M10B/D hydraulic rock drill on a bolting jumbo.

Release Time: 2024-08-03

Sichuan Phosphate Mine: Cross-section 4*3.5 meters, equipped with Woserld M10B/D hydraulic rock drill on a bolting jumbo. The rock hardness is F5, with a hole depth of 2.2 meters and bolt length of 2 meters. The average time per hole (drilling + bolting) is 1 minute and 40 seconds.

× How can I help you?