Project Case

project case

Hunan Pumped Storage Power Station, slope anchoring, bolting rig is equipped with a Woserld hydraulic rock drill

Release Time: 2024-07-18
Hunan Pumped Storage Power Station, slope anchoring, rock hardness F6-8. bolting rig is equipped with a Woserld hydraulic rock drill, hole diameter 64mm, hole depth 6 meters. Average time for drilling one hole is 2 minutes and 40 seconds

× How can I help you?