In an underground dewatering project in Xinjiang with a cross-section of 8 meters x 7.5 meters, a rock drilling rig equipped with the WOSERLD Hydraulic Rock Drill is used. The rock hardness ranges from F7 to F10, the hole depth is 4 meters, and the average time per hole is 2 minutes and 30 seconds.